The warning “this configuration is not available in Germany“ appears for ONGRID – business cases if the required power is above 18 kW.

In this case, you need a system configuration of more than one Sunny Island Cluster, SMA Multi-Cluster Box and SMA Grid Connection Box. Since the VDE-AR-N 4100 application rule in Germany, the grid connection box is no longer permitted for grid parallel operation means.
The following three options are available:

  1. Check the location of storage system and your project details.
  2. With an inverter power (nominal) of 18 kW, the configuration can be realised with a TS 48 V system.
  3. By increasing the required inverter power other Tesvolt storage systems can be considered. For example, a TS-I HV storage system starting at a power of 80 kW.

If you have any further questions, please contact your TESVOLT representative.